start date: 2024-01-11
end date:2024-12-01
№ | Contract Subject | ID | Date | Publication Date | Contract Price | Contractor |
1 | Contract for the repair of the bathroom of the electrical equipment hall of the Sevan HPP "MEK" CJSC, and the execution of floor painting works | 2024-DGD/-AKH-35 | 10/28/2024 | 04.11.2024 | 2 298 457 including VAT | T-CONSTRUCTION CJSC |
2 | Contract for finishing the walls of the turbine hall and the generator mezzanine of the "Arzni" HPP "MEK" CJSC, and performing floor repair works | 2024-DGD/-AKH-36 | 10/29/2024 | 04.11.2024 | 15 629 847 including VAT | T-CONSTRUCTION CJSC |
3 | Contract for cleaning and partial repair of high-speed flow of "Arzni" HPP "MEK" CJSC | 2024-DGD/-AKH-37 | 10/29/2024 | 04.11.2024 | 7 541 672 including VAT | T-CONSTRUCTION CJSC |
4 | Contract for the supply of end couplings for outdoor installation for the needs of Yerevan-1 HPP | 2024-PCD--12 | 10/31/2024 | 07.11.2024 | 1 699 200 including VAT | "ROSCABEL ARMENIA" CJSC |
5 | Contract for repair of emergency sections of secondary slopes of diversion channel No. 1 Argel HPP | 2024-DGD/-AKH-38 | 11/1/2024 | 08.11.2024 | 17 762 290 including VAT | T-CONSTRUCTION CJSC |
6 | Contract for cleaning the pressure pipeline log of Kanaker HPP | 2024-DGD/-AKH-39 | 11/1/2024 | 08.11.2024 | 7 645 754 including VAT | T-CONSTRUCTION CJSC |
7 | Contract for repair of old bypass "Yerevan-1" HPP | 2024-DGD/-AKH-40 | 11/1/2024 | 08.11.2024 | 20 237 644 including VAT | T-CONSTRUCTION CJSC |
8 | Contract for replacement of 110 kV circuit breaker Kanaker HPP | 2024-DGD/-GB-60 | 11/5/2024 | 11.11.2024 | ≤ 23 400 000 including VAT | Energanorogum OJSC |
9 | Contract for replacement of 0.4 kV circuit breakers [5 pcs.] for own needs of Razdan HPP | 2024-DGD/-GB-61 | 11/5/2024 | 11.11.2024 | ≤ 12 300 000 including VAT | Energanorogum OJSC |
10 | Contract for replacement of 110 kV SF6 circuit breaker "Sevan" HPP | 2024-DGD/-GB-62 | 11/5/2024 | 11.11.2024 | ≤ 23 400 000 including VAT | Energanorogum OJSC |
11 | Contract for restoration of segment automatic valves /4 pcs./ of the water intake of Kanaker HPP | 2024-DGD/-GB-63 | 11/5/2024 | 11.11.2024 | 53 968 033.61 including VAT | Energanorogum OJSC |
12 | Contract for the performance of work on dismantling and installing 110 kV SF6 circuit breakers of power transformers No. 1 and No. 2 of Kanaker HPP | 2024-DGD/-GB-64 | 11/5/2024 | 11.11.2024 | 4 426 053.73 including VAT | Energanorogum OJSC |
13 | Contract for restoration of 6 kV power cables on the territory of Sevan HPP | 2024-DGD/-GB-59 | 11/5/2024 | 11.11.2024 | 59 313 590 including VAT | T-CONSTRUCTION CJSC |
14 | Contract for supply of accumulator battery, charger and sub-charger for the needs of "MEK" CJSC "Hrazdan" HPP | 2024-PSD-13 | 11/11/2024 | 15.11.2024 | 10 800 000 including VAT | "BRIGHT IDEAS" LLC |
15 | Contract for the purchase and installation of a cabinet for uninterruptible operation and control of the turbine oil pressure device of hydropower unit No. 1 of Arzni HPP | 2024-DGD/-GB-65 | 11/18/2024 | 22.11.2024 | 35 845 000 including VAT | "T-ELECTRO" CJSC |
16 | Contract for the elimination of water leaks from the dismantling ring and sealing sections of the ball valve of hydropower unit No. 1 of the Arzni HPP | 2024-DGD/-GB-66 | 11/18/2024 | 22.11.2024 | 3 902 252 including VAT | Energanorogum OJSC |
17 | Contract for the elimination of water leaks from the dismantling ring and sealing sections of the ball valve of hydropower unit No. 3 of the Arzni HPP | 2024-DGD/-GB-67 | 11/18/2024 | 22.11.2024 | 3 902 252.66 including VAT | Energanorogum OJSC |
18 | Contract for the elimination of water leaks from the dismantling ring and sealing sections of the ball valve of hydroelectric unit No. 3 of the Arzni HPP | 2024-DGD/-GB-68 | 11/18/2024 | 22.11.2024 | 2 746 717.85 including VAT | Energanorogum OJSC |
19 | Contract for vehicle leasing with provision of management and technical operation services | 2024-TD--03 | 11/29/2024 | 05.12.2024 | ≤ 10 000 000 including VAT | "TECHSHIN GROUP" LLC |