Operation start: 1955
Altitude above the sea level: 928 m
Pressure (h) 36 m
Installed capacity: 5 MW
Turbines: 1 x 5 MW
Average annual production: 3.8 GWh
Diversion tunnels: 80 m
Operation regime: Non-irrigation seasons
The Yerevan-3 HPP is the last, 7th stage of the Sevan-Hrazdan Cascade. It is located after the Yerevan-1 HPP, on the main canal of Artashat.